logo

AC Los Ferranes Hotel

Project description

Detail and key figures

  • Owner: AC Hotel Los Ferranes, S.L.
  • Location: Gijón.

Main characterictics:

  • Cooling power installed: 400 kW.
  • Heating power installed: 713 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through gas boilers.
  • Distribution of water with two pipes per façade for rooms and four pipes for the rest of the treated areas.
  • Air Handling units by zones.
  • Fan coil type terminal units in rooms.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.