AIR CONDITIONING AND HEATING SYSTEM IN THE PARQUE SUR SHOPPING CENTRE IN MADRID

Project description

Detail and key figures

  • Affiliate: AMBITEC.
  • Owner: UNIBAIL-RODAMCO.
  • Price: €3,852,000.
  • Time for completion: Beginning June 2010 and engine start-up January 2013.
  • Ubicación: Madrid (España).

Main characterictics:

  • Terminal Units: 18 air conditioning units for air handling and ventilation and 4 roof tops.
  • Trigeneration installation through exchange of combustion fumes.
  • Installations of Air conditioning and Energy metering systems. Medium-voltage electrical installation and Transformer Stations.
  • Control Electrical installation, Low Voltage Electrical Installation for air conditioning and trigeneration systems.
  • Civil works: Installation of acoustic treatments in mechanical rooms. Installation of gas and fire detection systems.
  • Installation of Centralised Technical Control and Management System with motor absorption and energy metering system integrations.
  • Electricity generation: 1 MW.
  • Heating through cogeneration/absorption: 530kW.
  • Trigeneration cooling through absorption. 946kW.
  • Power dissipation: 2,318kW.
  • A gas Cogeneration Motor of 1 MW of electricity generation.
  • Double effect absorption plant as water cooler and heater powered by exhaust gases.
  • Two power dissipation towers of the hybrid type with variable frequency drives.
  • Medium voltage room and sectioning centre with two 2,000 and 1.600 KVA transformers.
  • Pumps and hydraulic distributions with variable flow rate.
  • Distribution of hot and cold water to terminal units through a circuit with 4 pipes of pre-insulated pipelines.