APARECIDA-TORDESILLAS DISASSEMBLING OF HIGH VOLTAGE POWER LINE

Project description

Detail and key figures

Disassembling of 220 KV overhead power line from the section T2 to T5 between the towns of Aparecida and Tordesillas.

  • Owner: Red Eléctrica de España.
  • Price: 5 million euros.
  • Time for completion: 1st Quarter of 2013 (7 months).
  • Location: Valladolid (Spain).

Main characterictics:

  • Line Length: 150 Km.
  • Line type: single circuit, Dúplex.
  • Cable: Grosbeak.