logo

Barbastro Hospital

Project description

Detail and key figures

  • Owner: D.G.A (Aragon's public health system).
  • Location: Barbastro (Huesca).

Main characterictics:

  • Cooling power installed: 2,494 kW.
  • Production of cold water through air cooled chillers.
  • Water distribution with four pipes.
  • Air Handling units with free cooling and energy recovery with four pipes for the rest of treated areas.
  • Fan coil type terminal units in rooms and offices.
  • Humidity control systems (wetting).
  • High efficiency filter in surgical block.
  • Centralised Technical Management Systems.