logo

Binary Centrer Office Building

Project description

Detail and key figures

  • Owner: Agraconsa Empresa Constructora S.A.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 930 kW.
  • Heating power installed: 840 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through low temperature gas boilers.
  • Four water distribution pipes and variable water flow rate.
  • Air Handling Units with free cooling and heat recovery.
  • Inductor type terminal units in offices.
  • Centralised consumption metering system.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.