logo

Cardenal Gomá Hotel

Project description

Detail and key figures

  • Owner: Villagoma Hostelería, S.L.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 555 kW.
  • Heating power installed: 242.8 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through low temperature boilers.
  • Water distribution with two pipes.
  • Air Handling units with free cooling by zones.
  • Fan coil type terminal units in rooms.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.