logo

Aragonia Shopping Centre

Project description

Detail and key figures

  • Owner: Zaragoza Urbana S.A
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 6,384 kW.
  • Heating power installed: 4,569 kW.
  • Production of hot water for ACS by gas boiler.
  • Four water distribution pipes and variable water flow.
  • Air Handling units with free cooling by zones.
  • Fan coil type terminal units in rooms.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.