logo

Ejea de los Caballeros Health and Social Centre

Project description

Detail and key figures

  • Owner: D.G.A (Servicio Aragonés de Salud).
  • Location: Ejea de los Caballeros (Zaragoza).

Main characterictics:

  • Cooling power installed: 708 kW.
  • Heating power installed: 790 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through gas boilers.
  • Distribution of water with two pipes per façade for rooms and four pipes for the rest of the treated areas.
  • Air Handling units with free cooling.
  • Fan coil type terminal units.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.