logo

Fire and Firemen Museum

Project description

Detail and key figures

  • Owner: FCC Construcción, S.A.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 326 kW.
  • Heating power installed: 326 kW.
  • Cold and centralised hot water production through water-water heat pump equipment, with ground water exploitation.
  • Water distribution with two pipes.
  • Air Handling units by zones.
  • Fan coil type terminal units in offices.
  • Mechanical ventilation.
  • Centralised Technical Management System.