HIGH VOLTAGE AIR POWER LINE FOR WIND FARM OF PUNTA PALMERAS (CHILE)

Project description

Detail and key figures

  • Owner: Acciona Energía.
  • Price: €3,800,000
  • Time for completion: February to September 2014.
  • Location: Canela Commune, Quoquimbo Region (Chile).

Main characterictics:

  • Power: 45 MW (15 wind turbines (3 MW Acciona Energía L22o KV), of the highest power operating in Chile.
  • Civil works, supply of equipment and complete electromechanical assembly.
  • Extension of line position and transfer of 220 kV for Transelec substation at the wind farm in Punta Palmeras.