logo

Hotel Hiberus

Project description

Detail and key figures

  • Owner: Zaragoza Urbana S.A.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 1,998 kW.
  • Heating power installed: 2,637 kW.
  • Cold and centralised hot water production through water-water heat pump equipment, with ground water exploitation.
  • Production of hot water for sanitary use by gas boiler.
  • Four water distribution pipes and variable water flow rate.
  • Air Handling units with free cooling by zones.
  • Fan coil type terminal units in rooms.
  • Solar thermal energy installation.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.