logo

Hotel PH Rey Fernando II of Aragon

Project description

Detail and key figures

  • Owner: Promociones Nicuesa S.A.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 870 kW.
  • Heating power installed: 1,625 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through gas boilers.
  • Variable Cooler Volume equipment for rooms.
  • Water distribution with four pipes.
  • Air Handling units with free cooling by zones.
  • Air conditioning with heat recovery for SPA and pool area.
  • Installation of solar collectors for hot water for sanitary use.
  • Mechanical ventilation.
  • Centralised Technical Management System.