logo

Hotel Tryp Zaragoza

Project description

Detail and key figures

  • Owner: Hormigones y Construcciones S.L.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 780 kW.
  • Heating power installed: 1,210 kW.
  • Production of cold water through air condensing chillers.
  • Production of hot water through gas condensing boilers.
  • Water distribution with four pipes.
  • Air Handling units by zones.
  • Fan coil type terminal units in offices.
  • Room air conditioning by heat pump equipment of variable cooler volume.
  • Mechanical ventilation.
  • Centralised Technical Management System.