INSTALLATIONS IN MERCADONA LOGISTICS CENTRE IN ABRERA

Project description

Detail and key figures

Electrical installations of medium voltage, low voltage and specials.

  • Affiliate: INELBO.
  • Owner: Mercadona.
  • Price: 13 million euros.
  • Time for completion: 2011 - 2016.

Main characterictics:

  • Overall power: 30,730 KVA.
  • Bread lines. 2x2000 KVA with 5 production lines.
  • Cold building: 3x2500 KVA + 2x2500 KVA, for frozen products, refrigerated products 3°C/12°C and fish.
  • Packaging building.- 1x1600 KVA.
  • Dry products building: 2x2500 KVA + 2x2500 KVA and 1x1600 KVA.
  • General services building: 400 KVA including offices, cafeteria and child daycare space.
  • Communal areas: 630 KVA comprising 2 medium voltage rings from the substation to the different transformation stations, fire protection pump building, drinking water and irrigation and exterior lighting of the block.
  • Total construction surface area: 120,000 m².