Music Conservatoire

Project description

Detail and key figures

  • Owner: ACS projects, works and construction projects, works and buildings.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 657 kW.
  • Heating power installed: 690 kW.
  • Production of cold water through air cooled chillers.
  • Production of hot water through gas boilers.
  • Four water distribution pipes and variable water flow rate.
  • Air conditioning handling units with free-cooling for Variable Air Flow Rate System.
  • Fan coil type terminal units in offices and variable air flow rate boxes.
  • Installation prepared for concert halls.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.