Offices in Plaza 14 Building

Project description

Detail and key figures

  • Owner: Forma Seis.
  • Location: Zaragoza.

Work performed:

  • Cooling power installed: 1,164 kW.
  • Heating power installed: 1,150 kW.
  • Production of cold water through air condensing chillers.
  • Production of hot water through low temperature boilers.
  • Four water distribution pipes and variable water flow rate.
  • Primary Air Handling Units with energy recovery.
  • Fan coil type terminal units in offices.
  • Centralised consumption metering system.
  • Mechanical ventilation.
  • Centralised Technical Management System.