logo

PINILLA-CAMPANARIO HIGH VOLTAGE POWER LINE ASSEMBLY AND LAYING

Project description

Detail and key figures

Assembly and laying of 400 KV high voltage overhead line between Pinilla and Campañario.

  • Owner: Red Eléctrica de España.
  • Price: 3 million euros.
  • Time for completion: last quarter of 2013 - 2014 (12 months).
  • Location: Albacete (Spain).

Main characterictics:

  • Line Length: 41 Km.
  • Line type: single circuit, Triplex.
  • Cable: Condor.

Related Projects