logo

PUERTO VENECIA SHOPPING CENTRE

Project description

Detail and key figures

Air conditioning systems in "Puerto Venecia" shopping centre.

  • Affiliate: Ambitec.
  • Owner: Eurofund Investments Zaragoza S.L.
  • Price: €5,974,634.
  • Location Zaragoza, Spain.
  • Time for completion: 2012 - 2013 (12 months).

Main Characteristics

  • The building consists of two areas: The northern area that includes the mall and the canal zone and the south area corresponding to leisure and sports centre.
  • Separate machine rooms for each area.
  • Water supply for the air conditioning system by ring condensation at constant temperature (18° - 30°C).
  • 9 cooling towers of 1,200 kW each.
  • Water condenser groups (3 units) for supplying air conditioners. One of magnetic levitation.
  • Air handling units with free cooling, adiabatic cooling and heat recovery.
  • Mechanical ventilation and smoke extraction system in car parks.
  • Centralised consumption control system.
  • Centralised control system.