logo

Saica Factory 4, El Burgo de Ebro

Project description

Detail and key figures

  • Owner: S.A. Industrias Celulosa Aragonesa.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 1,871 kW
  • Cold water production condensed by cooling water tower.
  • Cold water distribution with two pipes.
  • Air handling units in wiring rooms.
  • Office area air conditioning by air handling and fan coils units with cooling coil and resistors for heat.
  • Mechanical ventilation.
  • Chemical filtration of air in electrical rooms.
  • Centralised Technical Management Systems.