logo

Schindler factory offices

Project description

Detail and key figures

  • Owner: Schindler S.A.
  • Location: La Cartuja Baja (Zaragoza).

Main characterictics:

  • Cooling power installed: 724 kW.
  • Heating power installed: 700 kW.
  • Production of cold water through air condensing chillers.
  • Production of hot water through gas boilers.
  • Water distribution with four pipes.
  • Air Handling unit by zones.
  • Fan coil type terminal units in offices.
  • Installation of precision for CPD.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.