logo

Seminario Building

Project description

Detail and key figures

  • Owner: FCC Construcción, S.A. y EASA - Paraninfo Joint Venture.
  • Location: Zaragoza.

Main characterictics:

  • Cooling power installed: 2,296 kW.
  • Heating power installed: 2,322 kW.
  • Cold and centralised hot water production through water-water pump heaters, with ground water exploitation.
  • DPC with redundant water/direct expansion system.
  • Four water distribution pipes and variable water flow rate.
  • Inductor type terminal units.
  • Air Handling units with free cooling.
  • Underfloor heating and cooling.
  • Mechanical ventilation.
  • Centralised Technical Management Systems.