PROJECTS

ADAPTATION OF THE INSTALLATIONS OF THE MINISTRY OF INDUSTRY, ENERGY AND TOURISM

Adaptation of electrical installations to the low-voltage electro-technical regulations (REBT).

FIRE AND SPECIAL DETECTIONS IN ALICANTE'S PENITENTIARIES

Installation of fire detection, extraction of fumes and intercom in Alicante's penitentiary, enforcement and psychiatric centres.

INSTALLATIONS IN THE MIGUEL HERNÁNDEZ UNIVERSITY LECTURE ROOM

Electrical installations in the university lecture room: low-voltage, medium-voltage and special.

INSTALLATIONS IN THE GOLD RIVER HOTEL IN PORT AVENTURA

Electromechanical installations of the hotel: Low voltage, fire protection, special facilities, air conditioning and plumbing.

ELECTRIC INSTALLATIONS IN THE SOCIAL SECURITY TREASURY BUILDING

Electrical installation of low voltage, transformer station, medium voltage line and telecommunications installations in the building of the Social Security Treasury in Segovia.

ELECTRIC INSTALLATIONS IN THE SENATE BUILDING

Phase I works of the renovation of the low voltage installation of the SENATE.

ELECTRICAL INSTALLATIONS IN DAIRY PRODUCT FACTORY LACTALIS-NESTLÉ

Instalación eléctrica de BT, centro de transformación y línea de MT en la fábrica de productos lácteos LACTALIS-NESTLÉ de Guadalajara.

ELECTRICAL INSTALLATIONS IN THYSSENKRUPP LOGISTICS INDUSTRIAL UNIT

Low-voltage electrical installation of new Thyssenkrupp logistics industrial unit in Mostoles

PINILLA-CAMPANARIO HIGH VOLTAGE POWER LINE ASSEMBLY AND LAYING

Assembly and laying of 400 KV high voltage overhead line between Pinilla and Campañario.

APARECIDA-TORDESILLAS DISASSEMBLING OF HIGH VOLTAGE POWER LINE

Disassembling of 220 KV overhead power line from the section T2 to T5 between the towns of Aparecida and Tordesillas.

WORKS ON THE ELECTRIC LINE OF MEDINA DEL CAMPO – SALAMANCA

ELECTRIFICATION OF HIGH SPEED RAILWAY MEDINA DEL CAMPO-SALAMANCA. Installation of a biphasic 220/27,5 kV, 2x30 MVA Electrical Substation, four autotransformer centres (55/27,5 kV 1 x10 MVA, LAAT 220 Kv, 20km double circuit.

LAYING OF HIGH VOLTAGE AIR POWER LINE BESCANO-SANTA LLOGAIA

Laying of cable sections T2 and T3 for the high voltage air power line of 400 KV between Bescano and Santa Llogaia.

VARIOUS ACTIVITIES IN EDP HC ENERGÍA’S DISTRIBUTION NETWORK

Maintenance framework contracts of EDP HC Energía's medium and low-voltage distribution networks in the Autonomous Community of Madrid and the Valencian Community.

VARIOUS ACTIVITIES IN ENDESA’S DISTRIBUTION NETWORK

Framework contracts for maintenance and new construction implementation of ENDESA Distribution's medium and low voltage distribution in the provinces of: Barcelona, Almería, Jaén y Las Palmas de Gran Canaria.

VARIOUS ACTIVITIES IN IBERDROLA'S DISTRIBUTION NETWORK<

Framework contracts in distribution network maintenance in the provinces of: Albacete, Cuenca, Madrid, Guadalajara, Castellón, Alicante and Murcia.

ELECTRICAL INFRASTRUCTURE MAINTENANCE OF IBERDROLA. WIND FARMS

Contract for operation and maintenance of transformer stations, substations and HV lines of Iberdrola wind farms in different Autonomous Communities: Castilla-La Mancha, Castilla and Leon and Valencian Community.

MAINTENANCE OF TRANSPORT AND GAS DISTRIBUTION INSTALLATIONS

Maintenance of installations for transport, distribution and users attention service in gas receiver systems.

UNION FENOSA SUBSTATION MAINTENANCE

Maintenance framework contracts for the distribution network of UNION FENOSA substations in the provinces of Guadalajara, Cuenca and Segovia.

COMPREHENSIVE MAINTENANCE OF ALICANTE AND MURCIA PENITENTIARIES

Comprehensive maintenance service (conductive, preventive and corrective) of the penitentiaries in Alicante and Murcia for a period of two years.

COMPREHENSIVE MAINTENANCE OF THE HOSPITALS "DE PONIENTE"

Comprehensive electromechanical maintenance service and maintenance of electro-medical equipment for the hospitals of the complex "Hospitales de Poniente" located in the Andalusian provinces of Almería and Granada.

COMPREHENSIVE MAINTENANCE OF GLOBALCAJA OFFICE AND BUILDING NETWORK

Comprehensive maintenance service (conductive, preventive and corrective) of Globalcaja offices and buildings in Castilla-La Mancha.

MAINTENANCE AND OPERATION OF COGENERATION PLANT

Maintenance and operation of cogeneration plant consisting of 22 MVA combined cycle and 4 MVA biomass cogeneration, belonging to the PINASA board factory located in Fuentes (Cuenca).

MAINTENANCE AND OPERATION OF PHOTOVOLTAIC PLANT "EL CALAVERÓN"

Maintenance and operation of solar photovoltaic power plant "El Calaverón" located in the municipality of Villarrobledo (Albacete).

INVESTMENT PROJECTS OF ELECTRICITY AND INSTRUMENTATION OF CARTAGENA PETRO-CHEMICAL COMPLEX

Contract for investment project in improving and adapting the electrical and instrumentation installations of the petrochemical complex of Repsol in Cartagena.

IMAGINALIA SHOPPING CENTRE

OFFICES - COMMERCIAL

CONSTRUCTION OF TOWER 4 PORTA FIRAL IN BARCELONA

Construction work on the concrete structure of Tower 4 Porta Firal in Barcelona. It is expected to be completed in early 2016.

CONSTRUCTION OF HOMES FOR BABEL CO-OPERATIVE

Construction of 37 homes in Babel Building.

Solar-Plant-in-Cestas-Burdeos-Eiffage-Energia

CONSTANTIN SOLAR PLANT INSTALLATION IN CESTAS (FRANCE)

The plant has 25 generating units, a power of 300 megawatts (MW) is directly connected to the very high voltage network. It will produce more than 350,000,000 KWh (350 gigawatts per hour), which is equivalent to the average energy consumption of the entire population of Bordeaux.

INSTALLATIONS IN MERCADONA LOGISTICS CENTRE IN ABRERA

Electrical installations of medium voltage, low voltage and specials.

SUPPLY POWER LINE OF THE BREÑA II DAM (CORDOBA)

Electrical installations of medium voltage, low voltage and specials.

Wind-Farm-'Pawlowo'-Eiffage-Energia

WIND FARM OF PAWLOWO

Turnkey project

Wind-Farm-Caetite-Eiffage-Energia

WIND FARM OF CAETITÉ

Turnkey project

Wind-Farm-Garcimuñoz-Eiffage-Energia

WIND FARM GARCIMUÑOZ

Turnkey project

COMPREHENSIVE MAINTENANCE OF POST OFFICE INSTALLATIONS

Service contract for comprehensive maintenance of the facilities of the network of 3,797 offices and premises that Correos (Spanish post office) has throughout the country during a three-year contract.