Project description
Detail and key figures
- Owner: AC Hotel San Sebastián de los Reyes, S.L.
- Location: San Sebastián de los Reyes (Madrid).
Main characterictics:
- Cooling power installed: 457 kW.
- Heating power installed: 515 kW.
- Production of cold water through air cooled chillers.
- Production of hot water through low temperature gas boilers.
- Water distribution with four pipes.
- Air Handling units with free cooling by zones.
- Room air conditioning by independent heat pump equipment.
- Mechanical ventilation.
- Centralised Technical Management Systems.