Project description
Detail and key figures
- Owner: FCC Construcción, S.A.
- Location: Zaragoza.
Main characterictics:
- Cooling power installed: 326 kW.
- Heating power installed: 326 kW.
- Cold and centralised hot water production through water-water heat pump equipment, with ground water exploitation.
- Water distribution with two pipes.
- Air Handling units by zones.
- Fan coil type terminal units in offices.
- Mechanical ventilation.
- Centralised Technical Management System.