Project description
Detail and key figures
Assembly and laying of 400 KV high voltage overhead line between Pinilla and Campañario.
- Owner: Red Eléctrica de España.
- Price: 3 million euros.
- Time for completion: last quarter of 2013 - 2014 (12 months).
- Location: Albacete (Spain).
Main characterictics:
- Line Length: 41 Km.
- Line type: single circuit, Triplex.
- Cable: Condor.