Project description
Detail and key figures
- Owner: FCC Construcción, S.A. y EASA - Paraninfo Joint Venture.
- Location: Zaragoza.
Main characterictics:
- Cooling power installed: 2,296 kW.
- Heating power installed: 2,322 kW.
- Cold and centralised hot water production through water-water pump heaters, with ground water exploitation.
- DPC with redundant water/direct expansion system.
- Four water distribution pipes and variable water flow rate.
- Inductor type terminal units.
- Air Handling units with free cooling.
- Underfloor heating and cooling.
- Mechanical ventilation.
- Centralised Technical Management Systems.