Project description
Detail and key figures
- Owner: Arcelor Mittal Zaragoza.
- Location: Zaragoza.
Main characterictics:
- Cooling power installed: 1,677 kW.
- Heating power installed: 2014 kW.
- Production of cold water through air condensing chillers.
- Production of hot water through gas condensing boilers.
- Water distribution with four pipes.
- Air Handling units by zones.
- Fan coil type terminal units in offices.
- Independent equipment condensed by air or water for treating factory and electrical rooms.
- Mechanical ventilation.
- Centralised Technical Management System.