Project description
Detail and key figures
- EPC.
- Owner: EDP Renovaveis Polska SPZ.
- Price: 11.000.000€.
- Time for completion: May 2012 to September 2013.
- Location: Poland.
Main characteristics:
- Eiffage Energy consolidated its presence in Europe with the construction of Pawlowo wind farm in northwestern Poland (Poznan region).
- The works were carried out in the most difficult weather conditions, with lower temperatures and heavy snow.
- This wind farm consists of 53 wind turbines of 1.5 MW from Acciona (AW82).
- Civil works, including turbine foundations, foundations, roads and drains; perimeter fencing; platforms, and electrical works with supply of materials.