Project description
Detail and key figures
- Owner: World Trade Centre Zaragoza.
- Location: Zaragoza.
Main characterictics:
- Cooling power installed: 4,742 kW.
- Heating power installed: 4,614 kW.
- Production of cold water through air condensing chillers.
- Production of hot water through gas boilers.
- Four water distribution pipes and variable water flow rate.
- Air Handling units with free cooling by zones.
- Fan coil type terminal units in offices.
- Supply of primary air by Air Handling Units with air recovery and variable flow rate.
- Centralised consumption metering system.
- Mechanical ventilation.
- Centralised Technical Management System.