Binary Centrer Office Building

Cooling power installed: 930 kW.
Heating power installed: 840 kW.
Production of cold water through air cooled chillers.
Production of hot water through low temperature gas boilers.
Four water distribution pipes and variable water flow rate.
Air Handling Units with free cooling and heat recovery.
Inductor type terminal units in offices.
Centralised consumption metering system.
Mechanical ventilation.
Centralised Technical Management Systems.

Subsidiary:
EdificiodeoficinasBinaryCenter

Customer:

Agraconsa Empresa Constructora S.A.

Budget:

Duration:

Location:

Zaragoza.