CAGE building – Alternative emergency management centre

Responsibility: Project Management, Site Manager and design collaboration.
New build construction.
‘Leak proof’ building with reinforced concrete structure.
Building located inside the Almaraz nuclear power station.
High quality control in all procedures.
No installations are made.

Business line:
Subsidiary:
EDIFICIO-CAGE

Customer:

Iberdrola ingeniería y construcción

Budget:

0.9 million €.

Duration:

2014-2015

Location:

Almaraz, Cáceres.