Cardenal Gomá Hotel

Cooling power installed: 555 kW.
Heating power installed: 242.8 kW.
Production of cold water through air cooled chillers.
Production of hot water through low temperature boilers.
Water distribution with two pipes.
Air Handling units with free cooling by zones.
Fan coil type terminal units in rooms.
Mechanical ventilation.
Centralised Technical Management Systems.

Subsidiary:
HotelCardenalGoma

Customer:

Villagoma Hostelería, S.L

Budget:

Duration:

Location:

Zaragoza.