Fire and Firemen Museum

Cooling power installed: 326 kW.
Heating power installed: 326 kW.
Cold and centralised hot water production through water-water heat pump equipment, with ground water exploitation.
Water distribution with two pipes.
Air Handling units by zones.
Fan coil type terminal units in offices.
Mechanical ventilation.
Centralised Technical Management System.

Subsidiary:
MuseodelFuegoyBomberos

Customer:

FCC Construcción, S.A.

Budget:

Duration:

Location:

Zaragoza.