Hotel Hiberus

Cooling power installed: 1,998 kW.
Heating power installed: 2,637 kW.
Cold and centralised hot water production through water-water heat pump equipment, with ground water exploitation.
Production of hot water for sanitary use by gas boiler.
Four water distribution pipes and variable water flow rate.
Air Handling units with free cooling by zones.
Fan coil type terminal units in rooms.
Solar thermal energy installation.
Mechanical ventilation.
Centralised Technical Management Systems.

Subsidiary:
HotelHiberus

Customer:

Zaragoza Urbana S.A.

Budget:

Duration:

Location:

Zaragoza.